Post-Construction Cleaning
Post-construction cleaning gets new industrial units, extensions and fit-outs ready for handover. We clear construction dust from floors, steelwork, glazing and services, then do a final sparkle clean before the client walks in.
- Guide price £1.00–£3.00 per m²
- Free survey and fixed written quote
- UK-wide, planned around your shifts
Get a quote for post-construction cleaning
Tell us about the site. We usually reply the same working day.
In short: Post-construction cleaning gets new industrial units, extensions and fit-outs ready for handover. Builders' cleans for new units, fit-outs and extensions before handover. Guide price: £1.00–£3.00 per m², excluding VAT.
What is included in post-construction cleaning?
- Builders' rough clean during the build
- Construction dust removal from floors and surfaces
- Paint, plaster and sealant splashes removed
- Glazing, frames and sills cleaned
- Steelwork and high-level dust removal
- Sanitary ware and welfare areas
- Final sparkle clean before handover
- Snag cleans after client inspection
How do we carry out the work?
- Clean phased with the main contractor's programme
- Rough clean, then a final clean once trades have left
- Inspection against the handover checklist
- Snag items cleared quickly so handover is not delayed
How much does post-construction cleaning cost?
Guide prices below are for one-off work, excluding VAT. Your fixed price is set after a free survey.
| Job | Guide price |
|---|---|
| Typical rate | £1.00–£3.00 per m² |
| Minimum charge | £400 |
| London | £1.25–£3.75 per m² |
Work out a guide price for your site →
Frequently asked questions
Do you work for main contractors?
Yes. We work as a subcontractor to main contractors and fit-out firms, as well as directly for property owners.
Can you meet tight handover dates?
Yes. We size the team to your programme and can work nights and weekends before handover.
What does a builders' clean cost?
Usually £1.00–£3.00/m² outside London for industrial units, depending on how much dust and debris is left.
Do you remove builders' waste?
We clear cleaning waste. Large amounts of builders' waste are best handled by the contractor's skips, but we can price removal if needed.
What happens after you get in touch?
Tell us about the site
Call, chat or use the quote tool. Give us the site type, rough size and when you need the work.
Free site survey
We walk the site with you, agree the scope and spot access, isolation or hygiene points.
Fixed written quote
You get a fixed price, a method statement and COSHH sheets before anything is booked.
Clean and sign-off
Teams work around your shifts, then we walk the site with you and send a photo report.
Where do we provide post-construction cleaning?
Need a site cleaned?
Free survey, fixed written quote, teams that work around your shifts.
