Short answer: A factory deep clean should work from the top down: high-level steel and lighting first, then walls, plant exteriors and guarding, then floors, drains and welfare areas, finishing with a joint inspection and a photo record. Machines must be isolated by your own engineers before anyone cleans them.
How should a factory deep clean be planned?
- Agree the scope against your audit standard, lease or shutdown plan.
- Walk the site with your health and safety lead to agree hazards, isolation points and exclusion zones.
- Get the paperwork: risk assessment, method statement, COSHH sheets and any permits.
- Fit the team to the window so the clean finishes before production restarts.
Zone-by-zone checklist
High level
- Roof steel, purlins and portal frames
- Cable trays, trunking and conduit
- Lighting, ducting and sprinkler pipework
Walls and structure
- Walls, columns and doors washed
- Windows, frames and sills
- Partitions and mezzanine edges
Plant
- Machine exteriors, guarding and bases
- Conveyors and packing lines
- Control panels (outside only unless isolated and agreed)
Floors and drains
- Degrease and machine-scrub floors
- Clear drains, gullies and channels
- Clean line markings so they stand out
Welfare and offices
- Toilets, changing rooms and canteens
- Offices and meeting rooms
- Bins and recycling points
What should you get at the end?
A joint walk-round, a snag list cleared before the team leaves, and a photo pack showing before and after for each zone. Keep it with your cleaning records for auditors and insurers.
Prices are guide figures for 2026, excluding VAT, and vary by site. Get a fixed price with a free survey.